9663 Mendiburu, California City, CA 93505
Local realty services provided by:Better Homes and Gardens Real Estate Royal & Associates
9663 Mendiburu,California City, CA 93505
$340,000
- 3 Beds
- 2 Baths
- 1,786 sq. ft.
- Single family
- Pending
Listed by: tanykea ingram
Office: broadnax properties, inc.
MLS#:CRSR26012068
Source:CA_BRIDGEMLS
Price summary
- Price:$340,000
- Price per sq. ft.:$190.37
About this home
This move-in-ready home has been completely refreshed with new interior paint and new exterior trim paint, delivering a clean, modern look the moment you arrive, and that fresh feel continues throughout the property with brand new vinyl plank flooring installed throughout the entire home, giving you durability, style, and zero carpet to worry about. The kitchen is a standout, featuring new countertops, original oak cabinets that bring warmth and character, brand-new stainless steel appliances, a new stainless steel sink and faucet, a small walk-in pantry, and a breakfast nook attached that's perfect for everyday meals or morning coffee. The entire home benefits from new LED lighting and new plumbing fixtures, while the layout offers two living areas, a formal dining room, and a wood-burning fireplace in the family room that actually gets used instead of just photographed. The spacious primary suite includes a private slider leading directly to the backyard, a separate soaker tub and shower, dual-sink vanity with original oak cabinetry and tile countertops, a new toilet, and a walk-in closet, while the guest bathroom has been updated with a new countertop, new sink and faucet, new toilet, and fiberglass shower/tub combo. Outside, the landscaping around the home has been cleaned up
Contact an agent
Home facts
- Year built:1991
- Listing ID #:CRSR26012068
- Added:4 day(s) ago
- Updated:January 23, 2026 at 09:01 AM
Rooms and interior
- Bedrooms:3
- Total bathrooms:2
- Full bathrooms:2
- Living area:1,786 sq. ft.
Heating and cooling
- Cooling:Central Air
- Heating:Central
Structure and exterior
- Year built:1991
- Building area:1,786 sq. ft.
- Lot area:0.49 Acres
Finances and disclosures
- Price:$340,000
- Price per sq. ft.:$190.37
New listings near 9663 Mendiburu
- New
$259,900Active3 beds 2 baths1,276 sq. ft.21400 Jupiter Place, California City, CA 93505
MLS# 9993560Listed by: KELLER WILLIAMS REALTY BAKERSFIELD - New
$379,900Active4 beds 3 baths1,858 sq. ft.21420 Reed Place, California City, CA 93505
MLS# SR26009264Listed by: LUXURY COLLECTIVE - New
$379,900Active4 beds 3 baths1,858 sq. ft.8837 Holly Avenue, California City, CA 93505
MLS# SR26009362Listed by: LUXURY COLLECTIVE - New
$259,999Active3 beds 2 baths1,431 sq. ft.20412 90th Street, California City, CA 93505
MLS# SR26013905Listed by: REAL BROKER - New
$15,000Active10.4 Acres0 California City Blvd/gantt Rd, California City, CA 93505
MLS# IV26013138Listed by: HOME & LAND SOURCE - New
$30,000Active9.78 Acres810 California City Boulevard, California City, CA 93501
MLS# SR26007952Listed by: LAND & REAL ESTATE INVESTMENTS - New
$16,000Active0.23 Acres0 Fenmore Dr. #3, California City, CA 93505
MLS# HD26009038Listed by: KELLER WILLIAMS VICTOR VALLEY - New
$380,000Active4 beds 3 baths2,035 sq. ft.10121 Margery Avenue, California City, CA 93505
MLS# IG26008950Listed by: REALTY ONE GROUP EMPIRE - New
$349,990Active3 beds 2 baths1,850 sq. ft.8624 Forest Blvd, California City, CA 93505
MLS# SR26009907Listed by: MARRO REAL ESTATE, INC.