14 Crestaloma Dr, Pueblo, CO 81005
Local realty services provided by:Better Homes and Gardens Real Estate Kenney & Company
Listed by: jeff divelbiss
Office: re/max of pueblo inc
MLS#:238693
Source:CO_PAR
Price summary
- Price:$327,500
- Price per sq. ft.:$134.5
About this home
Walking distance to Regency park. Step inside to the open and flowing main level of this 4 level home. Notice the large living room and dining room with new updated flooring then takes you into the remodeled kitchen with tile back splash, newer dishwasher and updated light fixtures. Step out to the epoxy finished covered patio and private backyard with storage shed. Back inside to the lower level with updated flooring, baseboards, window coverings and the remodeled bathroom/laundry room. On the top level with the bedrooms is another remodeled bathroom and the third bathroom is off the large master. Water heater 2025, New gate and so much more.
Contact an agent
Home facts
- Year built:1977
- Listing ID #:238693
- Added:98 day(s) ago
- Updated:June 24, 2026 at 02:20 PM
Rooms and interior
- Bedrooms:3
- Total bathrooms:3
- Full bathrooms:3
- Flooring:New Floor Coverings
- Dining Description:On Main Level
- Kitchen Description:On Main Level
- Bedroom Description:Master Bedroom On Upper Level
- Basement Description:Partial Basement, Unfinished
- Living area:2,435 sq. ft.
Structure and exterior
- Year built:1977
- Building area:2,435 sq. ft.
- Lot area:0.16 Acres
- Exterior Features:Automatic Sprinkler, Dog Pen, Garden Area-Front, Garden Area-Rear, Lawn-Front, Lawn-Rear, Patio-Covered-Rear, Paved Street, Porch-Covered-Front, Rock-Front, Rock-Rear, Shed, Sprinkler System-Front, Sprinkler System-Rear, Trees-Front, Trees-Rear
- Foundation Description:Partial Basement, Unfinished
- Levels:4 Level
Finances and disclosures
- Price:$327,500
- Price per sq. ft.:$134.5
- Tax amount:$1,818
Features and amenities
- Amenities:Cable TV, Ceiling Fan(s), Garage Door Opener, Smoke Detector/CO, Walk-in Shower, Window Coverings
Parking
- Parking description:2 Car Garage Attached, Paved Street
- Garage spaces:2
New listings near 14 Crestaloma Dr
- New
$699,000Active4 beds 3 baths3,285 sq. ft.999 Charlo Dr, Pueblo, CO 81007
MLS# 240804Listed by: RE/MAX OF PUEBLO INC - New
$374,900Active4 beds 3 baths2,348 sq. ft.2210 Antelope Way, Pueblo, CO 81005
MLS# 240806Listed by: RE/MAX OF PUEBLO INC - New
$330,000Active4 beds 2 baths1,912 sq. ft.7 Emperor Court, Pueblo, CO 81005
MLS# 8909571Listed by: DREAM HOMES OF COLORADO, LLC - New
$355,100Active5 beds 3 baths2,018 sq. ft.2 Bitterweed Court, Pueblo, CO 81001
MLS# 4687894Listed by: REAL BROKER, LLC DBA REAL - New
$259,900Active2 beds 2 baths1,323 sq. ft.4153 Surfwood Lane #185, Pueblo, CO 81005
MLS# 6015028Listed by: RE/MAX OF PUEBLO INC - New
$268,500Active2 beds -- baths2,104 sq. ft.148 E Douglas Lane, Pueblo, CO 81001
MLS# 240794Listed by: RE/MAX OF PUEBLO INC - New
$315,000Active3 beds 2 baths1,380 sq. ft.4408 Holland, Pueblo, CO 81008
MLS# 240796Listed by: HOMESMART PREFERRED REALTY - New
$89,777Active3 beds 2 baths1,296 sq. ft.6464 Dillon Dr #48, Pueblo, CO 81008
MLS# 240797Listed by: SORELLA REAL ESTATE - New
$279,000Active3 beds 2 baths1,024 sq. ft.3023 2nd Avenue, Pueblo, CO 81008
MLS# 5654292Listed by: KELLER WILLIAMS CLIENTS CHOICE REALTY - New
$650,000Active5 beds 4 baths4,293 sq. ft.3 Harrogate Terrace, Pueblo, CO 81001
MLS# 6308331Listed by: EXP REALTY, LLC